The Local Development Scheme (LDS) is the timetable that sets out which documents the council will produce, when the consultation stages will be and when the council will adopt the documents.

The revised LDS was approved by Council on 20 November 2018. It replaces the previous version published in January 2018 and is available to view.

In terms of the Local Plan Review, the preferred approach version of the Plan was approved for consultation by Cabinet and Council in November 2018.  The consultation period is planned to run from 13 December 2018 to 7 February 2019.